Strong and beautiful boxes, cartons, pallets. Inner packing: plastic bag
Port
Tianjin
Lead Time :
within 35 days after the prepaid
malleable iron pipe fittings socket
Factory introduction:
Our scale:28/thousand square meters.
Our factory first built in 1994,our company was found in 1998.We have a history about 20 years.
In the early years ,we only do business in our own country.From 2001,we started to do business with the foreign client indreactly.In the 2007,our international trade department started operate.
In the 2012,our volume of trade is more than 200 dollars.
introduce our technological process:
1.smelt
2.modelling
3.casting
4. annealing
5.plain end and reshaping
6.impeller blasting
7.galvanize
8.threaded
9.test
10.packing
The above is the process of our produce,every step is very close and orderly.
Our workers are very serious,every product is best.
In the final,I want to say the tenet of Our company:producing safely,ensuring quality first,carring out the contract seriously,and keeping faith.